Item8539 – Prentice 2280 Log Loader

Prentice 2280 log loader
2009
CTR 320 delimber
Just in
Call for price

Here is a list of repairs we did in our shop:

  1. Drain and refill coolant tank for negative 34 degrees F freeze point and replace coolant level sender.
  2. Install new tachometer/hour gauge.
  3. Reseal jib cylinder.
  4. Replace base end main boom cylinders, pin and bushings.
  5. Reseal both main boom cylinders.
  6. Service engine, oil, fuel and air.
  7. Flush A/C system, replace compressor, receiver/dryer, binary switch, v-belt, cabin blower motor, Schrader valves and recharge system.
  8. Replaced outside door handle.

Item8539Item8539aItem8539bItem8539cItem8539dItem8539e